第1个回答 2009-02-07
24 motor-driven conversion installation instructions
1. The clicks before the installation of the electrical angle to be the total trip from the center of the installation.
2. Check after the End of the center of power to switch off the entire vehicle.
3. Must be installed prior to drive assembly within a rack until fork sliding between the drive and four-wheel-drive position.
绝对正确
第2个回答 2009-02-07
24 actuations transform electrical machinery's installment to show before 1. this click installs, must take the central place installment by the electrical machinery corner overall traveling schedule. 2. after taking the central place, switches off the entire vehicle power source. 3. before installing, between must dial the transmission unit internal rack the fork to skid to two drives with four to drive in the position.
第3个回答 2009-02-07
24 motor-driven conversion installation instructions
1. The clicks before the installation to the electrical angle of the total trip from the center of the installation.
2. Check after the End of the center of power to switch off the entire vehicle.
3. Must be installed prior to drive assembly within a rack until fork sliding between the drive and four-wheel-drive position.
绝对ok
第4个回答 2009-02-08
w 我不会英语```