翻译成中文-10

2.0 Indoor and outdoor decorations
2.1 Indoor decoration: ceramic tiled floor, plastering walls, the inner face of the walls shall be painted with coating materials. Light-duty steel keel, asbestos insulation ceiling, integrally mounted ceiling lamp.
2.2 Outdoor decoration: cement slurry plastering, the outer face of the wall shall be painted with coating materials, the doors and windows shall be made of aluminum alloys
3.0 All roofs shall be treated with heat preservation and waterproof layers.
(m) Area for constructions industrial parts should be proposed according to the technological requirements, all buildings shall be made of concrete floor with steel frames, floors to be treated with anti-corrosion paint or tiles according to the percentage of corrosion. Roofs shall be made of colorful steel plate materials
(n) Foundation works.
All protection of building and equipments shall be considered in the design. Designs of footing is according to soil investigation test as mentioned in paragraph 3.2 above

Supplementary Information

1. Basic Project Feature
Main features of Iraqi Raw Bentonite Clay Processing Plant are:
- Designed production capacity 75000TPY of sodium Activated Bentonite Clay
- Input raw material the Iraqi Bentonite Clay, as run-of-mine, which has the mineralogical composition and preliminary chemical analysis as follows:
The mineralogy composition is Montmorillonite, Palygorskite, Calcite, Gypsum, Dolomite, Apatsite and Quartz
The preliminary chemical analysis of Iraqi bentonite and the specifications of the montmoronolite are:

The class size of 100% minus 300 mm. with moisture content of less than 10%.

2.0 Site
Site should be cleared from any obstruction and leveled and all construction works shall follow the soil investigation report.
The factory location is sandy clay with dry and firm surfaces and this might be supplemented upon further information which means a complete soil investigation should be carried out later according to layout of the basic design. For the benefit here attach preliminary soil investigation of the nearby location just to have an idea about the soil behavior of the site.

3.0 Roads

室内和室外的饰物。2.0
室内装饰:陶瓷砖瓦2.1地板、墙壁、内在的脸上抹的墙涂涂料。轻型钢龙骨、石棉保温天花板,整体安装吊灯。
22户外装饰:水泥浆,外贴脸的墙漆应与涂料、门窗应使用铝合金
所有的屋顶3.0应与保温、防水层。
(m)区建设工业应根据工艺要求,所有建筑物的混凝土地板上应与钢框架结构,地板采用防腐漆或瓷砖按比例的腐蚀。屋顶应由彩色钢板材料
(n)基础工程。
所有的建筑设备保护应考虑的设计。设计的基础是根据土壤调查测试作为第一3.2以上

附加信息,

1。基本特征
伊拉克的主要特点是粘土原料膨润土加工厂。
75000TPY -设计产能的钠基膨润土活化黏土
输入的原料——伊拉克膨润土黏土,run-of-mine非金属矿产资源,具有初步的化学分析,如左:
组成的矿物改性蒙脱石、石膏、磨料、方解石,Apatsite和石英,
初步的化学分析及膨润土对伊拉克的规格montmoronolite如下:

这个班级大小的100%的300 mm.减去与含水率小于10%。

2.0地点
网站必须允许从任何障碍,且所有工程,应当遵循土壤的调查报告。
工厂的位置是桑迪黏土,干燥和坚定的表面上,这可能是补充完整的进一步的信息,应进行土壤调查后根据布局的基本设计。这里附加利益调查的基础上,初步土附近位置就有一个主意对土的行为。

3.0道路
温馨提示:答案为网友推荐,仅供参考
相似回答