no claim shall be considered on the ground of defective description or on the ground that additional operations other than those described are necessary to complete the WORK described, shown or inferred in the CONTRACT.
合同价格方面的 专业的请帮助 用软件翻译的请走开
我靠 一楼的这叫翻译么,别丢人了